The project plan is supported by:
1. The work breakdown structure, the budget, and the work packages.
2. The work breakdown structure, the budget, and the schedule.
3. The work breakdown structure, the work packages, and the schedule.
4. The work breakdown structure, the schedule, and the contingency plan.

Answers

Answer 1

Answer:

3. The work breakdown structure, the work packages, the budget and the schedule.

Explanation:

Supporting plans for the Project plan includes:

Resource plansCommunication PlansRisk management plans Quality plansBudget Procurement plans ScopeDelivery schedule

Based on this we can say that option 3 is correct since it includes budget & schedules.


Related Questions

Cheyenne Corp. uses a perpetual inventory system. Data for product E2-D2 includes the following purchases. Date Number of Units Unit Price May 7 40 $17 July 28 30 22 On June 1, Cheyenne. sold 20 units, and on August 27, 30 more units. Calculate the average cost of the goods sold in the sale.

Answers

Answer:

The COGS for the June 1st sale is $17 per unit, and the COGS for the August 27th sale is $20 per unit.

Explanation:

Date       Number of units     Unit balance      Unit cost      Average cost

May 7                40                      40                      $17                $17

June 1               (20)                     20                                           $17

July 28              30                      50                     $22               $20

August 27        (30)                     20                                           $20

The average COGS after the purchase on July 28 = [(20 x $17) + (30 x $22)] / 50 = ($340 + $660) / 50 = $20

           

________________ invested or made loans with 95 percent of the deposits that were being held..
°GoldsmithsCorrect
°John Keynes
°Ben Bernanke
°David Ricardo
°Goldsmiths

Answers

Answer:

(European) goldsmiths

Explanation:

European goldsmiths (Italian goldsmiths were the first) formulated a principle that only 5% of deposits were needed in reserve at any particular time, therefore they could lend 95% of the gold they held in deposit.

Goldsmiths would rent space in their vaults that allowed other people to keep their gold in a safe place. That led to transactions were notes indicating the amount of gold deposited would be traded instead of trading gold itself.

Eventually goldsmiths discovered that they could trade (lend) more money than the amount of gold they held in deposits, inventing fractional reserve banking.

Consider the labor market for computer programmers, which is in equilibrium. During the late 1990s, the value of the marginal product of all computer programmers increased dramatically.
Holding all else equal, what effect did this process have on the equilibrium wage in the labor market for computer programmers?

a) The equilibrium wage did not change.
b) It is not possible to determine the equilibrium wage.
c) The equilibrium wage decreased.
d) The equilibrium wage increased.

Answers

Answer:

C) The equilibrium wage decreased.

Explanation:

Marginal product is the change in total production as a result of a one-unit-addition of a factor of production. The equilibrium wage will decrease as the increase in marginal product of the computer programmers causes a subsequent increase in the demand for computer programmers, since employing one more worker brings about an even higher production. The resources available for wages are held constant and have to be shared among the now bigger number of programmers, lowering the wage equilibrium level.

What is a strategic​ group? A. A group of firms in different industries that follow similar strategies B. A group of firms in an industry following the same or a similar strategy in a given target market C. A group of firms in an industry following different strategies D. A group of firms that do not compete with each other E. A group of firms that target different markets with different strategies

Answers

Answer:

B. A group of firms in an industry following the same or a similar strategy in a given target market

Explanation:

Strategy group is a terminology used in business management to refer to specific group of people who are responsible for designing and formulating policies and business forecast aimed at creating sustainability in an industry.

The increased use of the Internet presents a lot of potential for which types of businesses?

Answers

Answer:

Local businesses, SME's and International businesses

Explanation:

The era of the internet has provided the work to integrate and create more opportunities for the business to grow and improve. More importantly, the internet has created a pathway for small businesses, local businesses, and small businesses to grow and expand globally. The internet has also helped businesses to set up their operations globally and locally to attract more markets and consumers.

The process of making choices in increments by evaluating the additional, or marginal, benefit against the additional, or marginal, cost of an action?

Answers

Answer:

Marginal decision making

Explanation:

Marginal decision making is can simply be said to be a consideration of a little more or a little less than one already have. This entails evaluating additional or lesser benefits against the additional o lesser cost of a good or service.

Cheers.

As new ride-sharing companies compete against taxi companies, which had previously enjoyed monopoly power, what will happen to the price and quantity of transportation services?a) Prices will rise and quantity will rise.b) Prices will fall and quantity will rise.c) Prices will rise and quantity will fall.d) Prices will fall and quantity will fall.

Answers

Answer:

b) Prices will fall and quantity will rise.

Explanation:

A new entrant that offers competitions to taxi services increases the supply of transport services. Customers that had been used to getting services from one source will now have a choice.

As per the law of supply, an increase in supply leads to a decrease in the price.  Monopolies set high prices to maximize profits due to a lack of competition. The two companies will try to win customers by offering competitive prices.  An increase in competition represents an increase in quantities supplied, which results in lower prices.

Charles wants to survey recent customers about the quality of service they received at his small auto service dealership. He has customers' mailing and e-mail addresses. Charles will likely use an online survey primarily because it offers?

Answers

Answer:

fast responses at a lower cost

Explanation:

Based on the information provided it can be said that Charles will likely use an online survey primarily because it offers fast responses at a lower cost. This is because the customers receive this in their mail and/or e-mail, and are easily able to fill it out in a couple of minutes. If Charles send's the survey through mail it will be one of the cheapest options other than e-mail which is completely free.

Charles will likely use an online survey primarily because it offers fast responses at a lower cost. Online surveys are cost-effective, easy to distribute, and provide instant data recording. Thus, option (D) is correct.

Charles wants to survey recent customers about the quality of service they received at his small auto service dealership. He has customers' mailing and e-mail addresses. Charles will likely use an online survey primarily because it offers fast responses at a lower cost.

Benefits of an online survey:

Fast responses at a lower cost: Online surveys are cost-effective and can collect data quickly.Ease of use: Platforms like SurveyMonkey make it easy to create and distribute surveys.Instant data recording: Responses are immediately stored in an online database, allowing for quick analysis.Anonymity: Online surveys can help collect truthful answers by maintaining respondent anonymity.Flexibility: Surveys can be easily modified and include multimedia such as videos.

However, it's crucial to ensure the survey reaches a representative sample and guard against multiple submissions to maintain data integrity.

Complete Question:

Charles wants to survey recent customers about the quality of service they received at his small auto service dealership. He has customers' mailing and e-mail addresses. Charles will likely use an online survey primarily because it offers:

A. relatively low response rates.

B. the ability to share videos with respondents.

C. the ability to ask sensitive questions with anonymity.

D. fast responses at a lower cost.

E. the opportunity to survey both existing and potential customers.

A brokerage firm holding 4 earnest money deposits, and 15 security deposits for managed single-family residences must have a minimum of how many trust accounts?

Answers

Answer:

at least 3 accounts

Explanation:

Once a broker starts to manage at least seven properties, the broker needs to have at least two accounts: one for operating funds and the other for security deposits.

This brokerage firm should have at least three accounts, one for holding earnest money deposits and the other two for holding security deposits.

Some states require that brokers maintain one specific trust account for holding rent revenue from every single property that they manage.

Final answer:

A brokerage firm typically needs a minimum of two trust accounts, one for earnest money deposits and one for security deposits, to comply with regulatory requirements against commingling of funds.

Explanation:

The question pertains to the number of trust accounts a brokerage firm must have when holding earnest money deposits and security deposits. The requirement for the number of trust accounts a brokerage firm should have is not determined by the number of deposits held, but rather by the regulations of the local real estate commission or financial regulatory body.

Typically, these regulations would require separate trust accounts for different types of funds to avoid commingling, which means one trust account for earnest money deposits and one for security deposits, making a minimum of two trust accounts necessary. However, it is always essential to adhere to the specific regulations of the jurisdiction in which the brokerage operates.

Corporations have limited liability, but lose ultimate control of corporate assets to the ______________ ..

Answers

Answer:

Stockholders

Explanation:

Stockholders are the owners of a company.  As owners , stockholders have voting rights in the company.  Shareholder elects directors who represent them on the board of directors. Each share is equivalent to one vote.  The board members recruit top management of the company. The board provides policy guidelines, makes critical decisions, and supervises senior management.

By electing board members, shareholders influence the management of the business. Should the stockholders be unhappy with the way the company is being managed, they can vote out the current director and elect new ones. The new directors then appoint fresh managers. In this way, shareholders maintain control of the assets of the company and its assets.

Aspen Ore purchased a vein of coal ore for $5,300,000. It is estimated that 32,000,000 tons of ore are available to be extracted. The estimated depletion expense for this year’s extraction of 2,790,000 tons of ore is: (Round any intermediary calculations to the nearest cent and your final answer to the nearest dollar.)

Answers

Answer:

$462,094

Explanation:

Depletion expense is a charge against profits for the use of natural resources. It is calculated by multiply the number of consumed units of the natural resources by the cost per unit.

Cost per unit = Total cost / total number of units expected to be extracted = $5,300,000 / 32,000,000 = 0.165625

Depletion expense = Cost per unit x  extracted units =  0.165625 x 2,790,000 = $462,094

Small businesses that are just getting off the ground often have problems with the difference between cash coming into the business and cash going out of the business. For example, if the company allows far too lenient credit sales terms, customers do not pay on time, which could cause cash to come in too slowly.
That’s why all businesses must keep a careful watch on their ________.

A. recording processes
B. asset summarization
C. advance payment accounts
D. cash flow

Answers

Cash Flow (D) just took the test

If the company allows far too lenient credit sales terms, customers do not pay on time, which could cause cash to come in too slowly. That’s why all businesses must keep a careful watch on their cash flow. Thus, option D is correct.

What exactly is cash flow?

A cash flow is a physical or virtual movement of money: a cash flow in its narrowest sense is a payment, particularly from one central bank account to another; the term 'cash flow' is most commonly used to describe the flows of cash in the business.

Cash flow management entails tracking the money that enters your business and comparing it to the money that leaves, such as bills, salaries, and property costs.

When done correctly, it provides a complete picture of cost versus revenue and ensures you have enough funds to pay the bills while also profiting.

Therefore, option D is correct.

Learn more about the cash flow, refer to:

https://brainly.com/question/19624717

#SPJ5

A music streaming service provides its customers with recommendations based on their past listening behavior. This is an example of marketing:_________

Answers

Answer: Forecasting

Explanation:

Forecasting is employed by the music streaming service to predict the songs their customers would like to hear based on their previous listening behavior.

Market forecast is the process of predicting future market outcomes based on previous records or patterns of the market.

The case suggests that one reason for the success of The Container Store is that it offers ________ rewards—rewards that are desired by the workers, as motivators.

A. instrumental
B. emotional
C. expectant
D. equitable
E. valent

Answers

Answer:

E) valent

Explanation:

Valent rewards refers to rewards that employees want and desire, therefore they are a source of motivation. Valent rewards are not the same for everyone, since every individual values a reward in a different way. For example, some people value public recognition a lot, while others only value monetary rewards.

If valent rewards are associated with good performance, then the employees will be motivated to perform better, e.g. additional bonuses given to salespeople if they increase their monthly sales by 10%.

Milton Friedman’s famous maxim, paraphrased: The social responsibility of business is to?

Answers

Answer: make a profit

Explanation: According to Milton Friedman, a famous economist, a business' main responsibility is to make a profit. This 1970 statement is still widely debatable today. He further goes on to say that a business prioritises its existing shareholders above other stakeholders. He is thus claiming that the aim of any business is to maximise returns for shareholders. Once their needs of profit maximisation are met, then the shareholders can then decide which social initiatives to involve themselves in, instead of hiring someone specifically in charge of deciding this for them.

On January 1, 2016, the Accounts Receivable balance was $28,100 and the balance in the Allowance for Doubtful Accounts was $3,200. On January 15, 2016 an $940 uncollectible account was written-off. The net realizable value of accounts receivable immediately after the write-off is:
a) $27,160.
b) $23,960.
c) $24,900.
d) $25,840.

Answers

Answer:

Net Accounts receivable = $24900

so correct option is c) $24,900

Explanation:

given data

Accounts Receivable balance = $28,100

Doubtful Accounts = $3,200

uncollectible account = $940

to find out

net realizable value of accounts receivable immediately

solution

we get here first Accounts receivable that is

Accounts receivable = Accounts Receivable balance - uncollectible account    ...............1

Accounts receivable = $28,100 - $940

Accounts receivable = $27160

and

allowance will be here

allowance = Doubtful Accounts - uncollectible account  .................2

allowance = $3,200 - $940

allowance = $2260

so Net Accounts receivable is

Net Accounts receivable = $27160 - $2260

Net Accounts receivable = $24900

so correct option is c) $24,900

Ramon has been appointed the manager of a retail store. He wants to bring the store into the modern era and direct its future by utilizing the latest trends in visual merchandising. What can Ramon do to achieve this?
A.
display fast-selling products near the cash register
B.
display banners at the entry point of the store
C.
install mannequin robots to display clothes
D.
hire experienced staff members to help customers
E.
stack up similar products in a similar pile

Answers

Answer:

C.  install mannequin robots to display clothes

Explanation:

Among the offered answers, a truly avantgarde, modern approach is to implement robot mannequins in the store. With this tactic, customers would be incentivized to approach this innovative customer journey. Through pioneering this technique, Ramon's company would get a competitive advantage through visual merchandising.

Answer:

C.  install mannequin robots to display clothes

Explanation:

Zoro Inc., a consumer electronics company, does not store any of its materials in the warehouse. Instead, the company's procurement department orders small quantities of materials as and when they are required. The vendors supply the ordered material directly to the company's manufacturing unit a day or two before the production starts. This arrangement helps Zoro Inc. to reduce costs and boost efficiency. This scenario best illustrates _____.a. mass customizationb. crowdsourcingc. just-in-time inventory managementd. continuous manufacturing systemse. contract manufacturing

Answers

Answer:

Option C is correct

Explanation:

This is to ensure that components needed for production of goods are delivered in time and it would help reduce capital investment on inventory.

Final answer:

Zoro Inc. uses just-in-time inventory management, ordering materials as needed and receiving them directly at the production site, which reduces costs and increases efficiency.

Explanation:

The procurement strategy employed by Zoro Inc., where the company orders small quantities of materials as and when they are required, with the materials being supplied directly to the manufacturing unit just before production begins, is an example of just-in-time inventory management. This approach minimizes costs related to storing materials in warehouses and enhances efficiency by reducing the capital tied up in inventory. Instead, it leverages coordinated schedules between the company and the vendors, ensuring material delivery aligns with the production needs.

Just-in-time systems benefit from advancements in communication and transportation, allowing for global-scale coordination. Adopted from key Japanese business practices, they emphasize the importance of efficiency and minimize resource wastage. This inventory management system is further supported by technologies that enable real-time tracking and ordering of parts, such as ERP systems with RFID, thus aligning with the concept of Industry 4.0.

(Last Word) From 2006-2010, the federal government paid $600 million in retirement benefits to deceased federal employees, with the checks being illegally cashed by relatives. This example illustrates:_________
A. The benefits-received principle.
B. Logrolling.
C. Bureaucratic ineï¬ciency.
D. The problem of limited and bundled choices.

Answers

Answer:

bureaucratic inefficiency.

Explanation:

From 2006-2010, the federal government paid $600 million in retirement benefits to deceased federal employees, with the checks being illegally cashed by relatives. This example illustrates the bureaucratic inefficiency..

it shows that bureaucrats are not efficient as they not fulfill their plan accordingly and locals easily cashed check through fraud.

Churchill Automobiles is a delivery truck manufacturer. It is a new company and wants to gather information on how to improve the standard of quality delivered by the company's production team. Based on this information, which of the following ISO standards must the company refer to:A) ISO 15001
B) ISO 9000
C) ISO 10001
D) ISO 12000

Answers

Answer: Option (B)

Explanation:

ISO 9000 is referred to as the set of the principle. These help an organization so as to ensure that they meet the consumers and stakeholder needs which are given within the sanctioned and administrative requirements that are related to the commodity product or the service. This deals with the essentials of quality management systems.

Churchill Automobiles should refer to ISO 9000, specifically ISO 9001:2008, which outlines the standards and principles necessary for improving the quality management system of their delivery truck manufacturing processes.

Churchill Automobiles, a delivery truck manufacturer, is seeking to improve the standard of quality delivered by its production team. The relevant ISO standard for a company looking to enhance its quality management system is B) ISO 9000, specifically ISO 9001:2008. ISO 9000 outlines a set of standards to ensure organizations can consistently meet customer and other stakeholder needs within statutory and regulatory requirements related to a product or service.

ISO 9001:2008 incorporates the following eight fundamental principles of quality management:

Customer-focused

Leadership

Involvement of people

Process approach

Systems approach to management

Continual improvement

Factual approach to decision making

Mutually beneficial supplier relationship

These principles are integral to building a quality management system that promotes transparency, consistency, and continual improvement, ensuring that Churchill Automobiles can enhance the quality of its delivery trucks and maintain customer satisfaction.

each professor averages one publication per year and both are excellent teachers. given this information, the wage difference is best explained by

Answers

Answer:

Royalty

Explanation:

The difference in their earnings would be by the Royalty they receive from their publications. If the Royalty of one teachers publications is more than that person would be earning more.

Royalty is dealt through a different account called Royalty Account.

Countries that currently have low real GDPs per capita are destined to always have lower living standards than countries that currently have high real GDPs per capita.
True or False

Answers

Answer:

The correct answer is the option: True.

Explanation:

To begin with, the GDP per capita is a monetary measure that establishes the value of the final goods and services produced in an economy divided by the total amount of citizens within that particular economy, therefore that it measures the amount of production that an individual inside that country produces.

Secondly, the living standards refers to the combination of factors that determinates the quality of life inside a certain economy, therefore that with higer level of living standards the life inside a country is better for most of the individuals within and lower living standards determinates that the life in a country is not so good as others. Moreover, this type of measure is affected by the GDPs per capita of the economy and therefore that a low GDPs per capita impacts in a low living standard and a high GDPs per capita determinates a high living standard.

a. Jose's opportunity cost of producing and consuming one more orange is 2 melons. b. Alex's opportunity cost of producing and consuming one more orange is 2/3 melon. c. Alex's opportunity cost of producing and consuming one more orange is 4,000 melons.
d. Jose's opportunity cost of producing and consuming one more orange is 1/2 melon.

Answers

Answer:

Since the question is incomplete, we could infer that you like to know how to calculate opportunity cost.

Explanation:

Opportunity cost is the value of the next best alternative or option.

Opportunity Cost= FO−CO

where:

FO=Return on best foregone option

CO=Return on chosen option

Let's take for example, Jose expected return on investment in producing one orange is 20 percent over the next year, and also expects the return of investment for melon to be 18 percent over the same period.

His opportunity cost of choosing the melon over the orange using the formula FO−CO = (20% - 18%), which equals two percentage points.

A broker desires to keep an escrow account in an interest bearing account. Would this be legal?

Answers

Answer:

the correct answer is YES

Explanation:

All parties agree and get in writing who and where the money is going

GOOD LUCK

Holly wants to have an extravagant wedding on an exotic, tropical island. She dreams that the weather will be perfect and that all her friends and family will have the most memorable time of their lives. This describes Holly’s _____ expectations with regard to this event.

Answers

Answer:

Ideal Expectations.

Explanation:

Ideal expectations are something where the desired expectations are equal to the perfect plan that is expected out from the real result with zero modifications. Holly here dreams of a perfect imaginative wedding which she finds to be perfect in every sense. Thus, this type of expectation is termed as ideal expectation.

When an insured decides to change her mode of premium payment from annually to monthly, the total premium due would:A. FluctuateB. IncreaseC. Remains the sameD. Decrease

Answers

Answer:

correct option is B. Increase

Explanation:

solution

when change payment from annually to monthly  

so premium due would be increase as in annual premium  

because premium is paid at the start of the year where is in twelve monthly installment last premium is almost at the end of the year

So that, when the premium is paid on an annual basis insurance company is access to full premium at the start  

it can be used for generating return

so correct option is B. Increase

When an insured decides to change her mode of premium payment from annually to monthly the total premium due would remain the same.

Explanation:

Since the amount is paid annually, changing it to monthly payment will mean the spread of the annual premium that is supposed to be paid over the twelve months which will be an equal amount.

Therefore there would be no change in the total premium due to be paid.

#leanwithbrainly

Carroll Inc., a cell phone manufacturer, has its assembly operations performed by Mortimer Corp., a firm that deals exclusively in assembling products for other companies. This scenario indicates that Carroll engages in the practice of ___.

Answers

Answer:  Outsourcing

Explanation Outsourcing refers to the business process of recruiting a group across from a corporation to perform menial tasks and produce products that perhaps the firm's own workers and personnel have historically done in-house.

Outsourcing is indeed a process practiced as an expense-cutting method for businesses in general. As just that, this can impact a broad variety of jobs, including customer support to production to back offices.

Usually, external organizations arrange with their staff distinct remuneration systems than that of the outsourcing company, allowing them to finish the work for less pay.

Organizations could use an outsourcing approach in conjunction to cost-cutting to put more focus on the key business issues. Outsourcing anti-core operations will boost efficiency and effectiveness since these smaller activities are performed much better by another agency than the business involved.

Dutch researcher Geert Hofstede identified four cultural dimensions by studying _____data on IBM employees from dozens of countries___.

Answers

Answer:

employee value scores branch offices  

Explanation:

Geert Hofstede studied a large database of employee value scores collected within IBM Corporation between 1967 and 1973 in over 70 different branch offices. He published his first results in 1980 which included data from more than 100,000 IBM employees that worked in branch offices in 40 countries. He later expanded his study to include more than 70 different branch offices and countries.

The 4 cultural dimensions that Hofstede identified are:

Individualism-collectivism Masculinity-femininity power distance uncertainty avoidance
Final answer:

Geert Hofstede conducted research based on survey data from IBM employees across many countries to identify four cultural dimensions: Power Distance Index, Individualism versus Collectivism, Masculinity versus Femininity, and Uncertainty Avoidance Index.

Explanation:

Dutch researcher Geert Hofstede studied cultural differences across countries and introduced the concept of cultural dimensions. The research he conducted was based on survey data collected from IBM employees across dozens of nations. The four dimensions that he identified were: Power Distance Index (PDI), Individualism versus Collectivism (IDV), Masculinity versus Femininity (MAS), and Uncertainty Avoidance Index (UAI). These dimensions represent essential and distinct cultural preferences, and understanding these can foster effective cross-cultural communication and business practices.

Learn more about Hofstede's cultural dimensions here:

https://brainly.com/question/34581173

#SPJ3

Flash Card Inc. recently underwent a significant company-wide change that involved revision ofits manufacturing and leadership processes. The result of this was a stronger emphasis on horizontalcoordination. This level of change is referred to as:
(A) reorganization.
(B) reengineering.
(C) e-engineering.
(D) strategic planning.
(E) corporate structuring

Answers

Answer: Option (B)

Explanation:

Reengineering is referred to as the remodel of the business or organization  processes and further the systems and the structure of the organization— so as to accomplish the dramatic development in their performance. It has been also referred to as the new approach to adhere to the business development, with potential so as to accomplish dramatic improvement in their performance.

Which of the following price indices is designed to measure changes in the prices of goods and services purchased by a typical individual?
a. Producer Price Index
b. Index of Leading Economic Indicators
c. Gross Domestic Product (GDP) Deflator
d. Consumer Price Index

Answers

Answer:

d. Consumer price index

Explanation:

Consumer price index in any country consists of goods and services that are used in day to day activities by consumers e.g. daily food items, utilities, transportation etc. The index is used to measure the increase in weighted average prices of the constituents over a particular time.

Option A is price index for producers that measures the increase in price of goods and services that are typically used by different producers for their output.

Option B is an analysis that is used to assess the trends of any economy. This analysis is performed by government economists, officials and government to make informed decisions about future actions. Individuals have no use of the index.

Option C Gross domestic product (GDP) deflator is a price adjustment to GDP of current year to depict the actual growth in value of goods and services produced in a particular year. GDP deflator is a reduction of inflation rate from nominal rate of increase in GPD.

Other Questions
5 Marks: 1 The type of license which will allow a person to drive a large truck or a van designed for 16 or more passengers is a ____. The process of dividing the potential market into sub-markets with common needs and features is called:________A- SegmentationB- Target marketingC- PositioningD- Market coverage Read this excerpt from chapter 1 of The Scarlet Letter. Certain it is, that, some fifteen or twenty years after the settlement of the town, the wooden jail was already marked with weather-stains and other indications of age, which gave a yet darker aspect to its beetle-browed and gloomy front. The rust on the ponderous iron-work of its oaken door looked more antique than any thing else in the new world. The author most likely include the words "darker aspect," "beetle-browed," "gloomy," and "ponderous" in order toa. impart a melancholy moodb. impart a mysteries moodc. establish a formal, civilized settingd.establish and oldfashioned setting Using the reaction given above, how many moles of sodium bicarbonate are needed to produce 24 L ofsodium citrate (NazC,H,O,)? (Density of sodium citrate is 1.7 g/mL) In an advertisement, a pizza shop claims its mean delivery time is 30 minutes. A consumer group believes that the mean delivery time is greater than the pizza shop claims. A random sample of 41 delivery times has a mean of 31.5 minutes with standard deviation of 3.5 minutes. Does this indicate at a 5% significance level that the mean delivery time is longer than what the pizza shop claims? Sam & Avery are making small and large birdhouses for a craft show. Small houses sell for $10 and large houses sell for $15. It takes Sam 3 hours to build small houses and 5 hours to build large houses. He only has 24 hours of building time. Avery only has time to decorate 12 houses of either size. How many small & large houses should be made to make the most money?If Sam had 30 days instead of only 24 hours and Avery had time to decorate 100 birdhouses instead of only 12, discuss solution methods you used and why. Practice using undefined terms in definitions and wanalyzing diagrams.AsignmentWhich defines ray?O a piece of a line with two endpointsO all points equidistant from a given pointO two line segments with a common endpointO a piece of a line that starts at the endpoint and extends indefinitely in one direction Put these different types of radiation in order from MOST to LEAST penetrating.A)Alpha > Beta > GammaB)Gamma > Alpha > BetaC)Gamma > Beta > AlphaD)Beta > Gamma > Alpha Question 1 with 8 blanksPrimero (1) You Answered prende Correct Answer isprende (prender) tu computadora. (2) You Answered empezaempezaIncorrect or extra word (empezar) a escribir tu tarea. No (3) You Answered perdasperdasIncorrect or extra word (perder) el tiempo. Cuando termines, (4) You Answered guarda Correct Answer isguarda (guardar) el archivo cuidadosamente. (5) You Answered rIncorrect accent or capitalizationevisa Correct Answer isRevisa (revisar) lo que escribiste. Fina Andre Candess manages an office supply store. One product in the store is computer paper. Andre knows that 10,000 boxes will be sold this year at a constant rate throughout the year. There are 250 working days per year and the lead-time is 3 days. The cost of placing an order is $30, while the holding cost is $15 per box per year. How many units should Andre order each time to minimize his annual inventory cost? 7a-3=3-2a(If there is no solution, type in "no solution") a= Answer Here are summary statistics for randomly selected weights of newborn girls: n=235, x=30.5 hg, s=6.7 hg. Construct a confidence interval estimate of the mean. Use a 95% confidence level. Are these results very different from the confidence interval 28.9 hg< < 31.9 hg with only 12 sample values, x=30.4 hg, and s=2.3 hg?What is the confidence interval for the population mean ? Solve the inequality for u-5u+27 [less than or equal to] 2 Jack lives on the fringe of society and is constantly looking for ways to get high he has consumed alcohol, smoked pot, and enjoys what some would consider unusual sexual experiences. He has been involved in a few fights, but was not very good at fighting. Since Jack spends a lot of time high, it is difficult to know if his failed attempts of fighting were due to fear, clumsiness, or shear weakness. What type of gang will Jack join? Family therapy tries to involve all of the members of the clients family in the process.True or False A light wave traveling through an unknown medium strikes the boundary withwater at a 45 angle and then refracts toward the boundary. What could the Atlas Company plans to sell 145,000 units in November and 190,000 units in December. Atlas's policy is that 15% of the following month's sales must be in ending inventory. On November 1, there were 21,750 units in inventory. It takes 35 minutes of direct labor time to make one unit. Direct labor wages average $19 per hour. Variable overhead is applied at the rate of $7 per direct labor hour. Fixed overhead is budgeted at $60,500 per month. What is the budgeted production in units for November?a. 121,000 units b. 151,750 units c. 100,000 units d. 125,600 units e. 140,000 units 10.31988 to the nearest hundredth Mike calls Beth and asks her to referee a soccer game. Beth is not obligated to work the game. If she accepts the assignment and works the game, she is told the time of the game,she must wear an approved uniform, and she is paid a fee. Once on the pitch (field) she isin complete control. Beth is considered: A. an incidental contractor.B. a principal.C. an employee agent.D. an independent contractor. Outside a home, there is a 5-key keypad with letters Upper A comma Upper B comma Upper C comma Upper D and comma Upper E that can be used to open the garage if the correct five-letter code is entered. Each key may be used only once. How many codes are possible? Steam Workshop Downloader